Contact Us

Service 06

Repair is the cheapest thing on the whole board

A broken 48×40 on a sound frame can usually be put right and sent back out carrying freight. Replacing it with a new pallet typically costs more and uses far more new wood. We match repair requests with partner suppliers in our network who run repair lines or on-site crews.

Short answer

Repair is priced by the partner supplier and depends on the class of repair — from a companion board up to a full re-deck — plus volume, the condition of the cores and distance.

Repaired units should be re-graded down a step, never relabelled at their old grade.

Request a quote · no phone tag

Quote a repair run

One form, one request. We pass it to partner suppliers in our network, and a partner supplier follows up with a quote.

A working address so a partner supplier can reply.

US or Canada: area code then 7 digits.

Two-letter code or full name.

US ZIP code or Canadian postal code.

Pick one or type your own.

Whole units.

We use your details only to quote and schedule. No lists, no resale — see our privacy policy.

The repair catalogue

Common classes of repair, and what each one fixes

At many repair yards a grader marks the class on the stringer in chalk, and the repair station reads the chalk rather than a work order — which is how a repair line keeps up with high volume.

Common repair classes (exact scope varies by supplier)
ClassWorkFixes
Companion boardA sound board nailed alongside a cracked oneSingle cracked deck board
Board replacementCracked board removed and replacedBroken or missing deck board
Stringer plugPlug or scab block let into a split stringerSplit or notched-out stringer
Stringer doubleFull-length companion stringer addedBadly split stringer
Partial re-deckThree or more top boards replacedMultiple deck failures
Full re-deckAll top boards replaced, bottom checkedWorn-out deck, sound frame
Re-squareDisassemble and rebuild to squareTwisted or racked pallet
Denail and re-fastenAll fasteners replaced with helicalLoose, rattling pallet

Pricing usually assumes a minimum run on cores that are sound enough to repair. Wet, mouldy or contaminated units are normally rejected at intake rather than repaired badly.

How a repair line works

Eight stations, one chalk mark

  1. 01

    Intake grade

    Every unit chalk-marked with a repair class or rejected. This single decision drives everything downstream.

  2. 02

    Denail

    Failed boards pulled; shiners and broken shanks removed. A shiner tears product and hands alike.

  3. 03

    Board selection

    Replacement lumber pulled from reclaimed stock binned by dimension — not cut fresh.

  4. 04

    Fasten

    Helically threaded nails to a pattern, placed away from board ends to avoid splitting.

  5. 05

    Stringer work

    Plugs, scabs and companion stringers for split stringers.

  6. 06

    Square check

    Diagonal measured. Out-of-square units go back for re-squaring; they jam conveyors otherwise.

  7. 07

    Re-grade

    A second, independent grading pass. A repaired unit should drop a grade.

  8. 08

    Stamp and band

    Grade and month stamped, stacked, banded, labelled with count.

Key takeaways

  • Repair cost per unit is usually well below replacement cost, and it keeps sound wood in use.
  • Smooth-shank nails are the most common cause of repeat failures. Ask whether the supplier uses helical nails.
  • Out-of-square is invisible to most receiving teams and catastrophic to automated handling.
  • A repaired pallet re-graded honestly is worth more long-term than one relabelled optimistically.

On-site repair

For operations generating high monthly volumes, some partner suppliers will run a repair crew at your facility with mobile tooling and delivered lumber. It eliminates the freight leg entirely, which is often worth more than the labour differential.

Ask about on-site repair

Questions

Repair questions

Can our own pallets be repaired and returned?

Yes — that is a toll-repair arrangement, common for branded or custom-size stock. The supplier collects, repairs, re-grades and returns your own units. Minimum runs and turnaround are set by the supplier.

Is a repaired pallet as strong as a new one?

Not quite. A board replacement returns a unit close to its original rating; a full re-deck on an older frame will carry less than a new build. That is exactly why repaired units should be re-graded down — the grade is the honest signal. See load capacity.

What makes a pallet unrepairable?

Two or more split stringers, a broken block pattern, water saturation, mould, chemical staining, or wood that has gone soft from repeated wetting. Those are usually ground. Be suspicious of anyone who claims nothing is unrepairable.

Do repaired pallets need re-treating for export?

If they are going for export, yes, and this matters: repairing an HT-stamped pallet with untreated lumber voids the stamp. Ask the supplier how they keep treated and untreated board stock separated. See heat-treated pallets.

Failure patterns

Which part fails, and how it is usually fixed

Pallet damage follows a fairly stable pattern across the industry. It is also diagnostic: when your own returns look nothing like this, the cause is not ordinary wear.

Indicative failure pattern and typical repair class
PartHow commonUsual causeTypical repair
Lead board, topMost commonAngled fork entryCompanion board / replacement
Interior deck boardVery commonPoint load, dropped productCompanion board / replacement
Stringer end splitCommonFork tine impactStringer plug / double
Bottom board missingCommonPallet jack, dock plateBoard replacement
Fastener looseningOccasionalSmooth nails, thermal cyclingDenail and re-fasten
Out of squareOccasionalSide loading, rack creepRe-square
Full deck wearLess commonEnd of service lifeFull re-deck
Centre stringer splitLess commonOverload, point loadingStringer double

Repair versus replace

Why repair usually wins on cost per trip

Repair is not maintenance of a pallet. It is interruption of a cascade: a sound frame with a few bad boards is far cheaper to fix than to replace. Ask the partner supplier to quote both so you can compare.

Repair and replacement options compared (qualitative; quotes vary by supplier)
OptionResulting gradeWhen it makes sense
Companion boardBOne cracked deck board on a sound frame
Board replacementBA broken or missing board
Stringer plug#2A split stringer where the load is light
Full re-deckBWorn deck boards on a sound frame
Re-squareBA racked pallet bound for automated handling
Replace with recycled AACustomer-facing freight where appearance matters
Replace with newNewCustom sizes or when no sound cores are available

Toll repair

Having your own pallets repaired and sent back

Common for operations with branded, custom-size or specification stock where replacement is not a simple substitution.

What to agree for toll repair
ItemWhat to ask
Minimum runHow many pallets per run?
TurnaroundHow long from collection to return?
Collection and returnIncluded, or charged by distance?
PricingBy repair class, in writing
RejectsReturned to you, or bought as cores?
Re-gradingIndependent second pass, stamped?
BrandingPreserved and restencilled if needed?
Treated stockSegregated, re-treated and re-stamped if repaired?
ReportingRepair-class breakdown with the return?

What on-site repair usually involves

A supplier's crew and tooling inside your building, which removes the freight leg entirely.

  • A small crew with mobile pneumatic tooling
  • Reclaimed lumber delivered on a schedule
  • Your grade specification, applied on site
  • Regular repair-class and volume reporting
  • A per-repair charge for delivered board stock
  • Often net cheaper than freighting both ways

Got a pile of broken pallets?

They are usually worth more repaired than scrapped. Send a count and a photo and a partner supplier in our network will follow up.