Service 06
Repair is the cheapest thing on the whole board
A broken 48×40 on a sound frame can usually be put right and sent back out carrying freight. Replacing it with a new pallet typically costs more and uses far more new wood. We match repair requests with partner suppliers in our network who run repair lines or on-site crews.
Short answer
Repair is priced by the partner supplier and depends on the class of repair — from a companion board up to a full re-deck — plus volume, the condition of the cores and distance.
Repaired units should be re-graded down a step, never relabelled at their old grade.
The repair catalogue
Common classes of repair, and what each one fixes
At many repair yards a grader marks the class on the stringer in chalk, and the repair station reads the chalk rather than a work order — which is how a repair line keeps up with high volume.
| Class | Work | Fixes |
|---|---|---|
| Companion board | A sound board nailed alongside a cracked one | Single cracked deck board |
| Board replacement | Cracked board removed and replaced | Broken or missing deck board |
| Stringer plug | Plug or scab block let into a split stringer | Split or notched-out stringer |
| Stringer double | Full-length companion stringer added | Badly split stringer |
| Partial re-deck | Three or more top boards replaced | Multiple deck failures |
| Full re-deck | All top boards replaced, bottom checked | Worn-out deck, sound frame |
| Re-square | Disassemble and rebuild to square | Twisted or racked pallet |
| Denail and re-fasten | All fasteners replaced with helical | Loose, rattling pallet |
Pricing usually assumes a minimum run on cores that are sound enough to repair. Wet, mouldy or contaminated units are normally rejected at intake rather than repaired badly.
How a repair line works
Eight stations, one chalk mark
- 01
Intake grade
Every unit chalk-marked with a repair class or rejected. This single decision drives everything downstream.
- 02
Denail
Failed boards pulled; shiners and broken shanks removed. A shiner tears product and hands alike.
- 03
Board selection
Replacement lumber pulled from reclaimed stock binned by dimension — not cut fresh.
- 04
Fasten
Helically threaded nails to a pattern, placed away from board ends to avoid splitting.
- 05
Stringer work
Plugs, scabs and companion stringers for split stringers.
- 06
Square check
Diagonal measured. Out-of-square units go back for re-squaring; they jam conveyors otherwise.
- 07
Re-grade
A second, independent grading pass. A repaired unit should drop a grade.
- 08
Stamp and band
Grade and month stamped, stacked, banded, labelled with count.
Key takeaways
- Repair cost per unit is usually well below replacement cost, and it keeps sound wood in use.
- Smooth-shank nails are the most common cause of repeat failures. Ask whether the supplier uses helical nails.
- Out-of-square is invisible to most receiving teams and catastrophic to automated handling.
- A repaired pallet re-graded honestly is worth more long-term than one relabelled optimistically.
On-site repair
For operations generating high monthly volumes, some partner suppliers will run a repair crew at your facility with mobile tooling and delivered lumber. It eliminates the freight leg entirely, which is often worth more than the labour differential.
Ask about on-site repairQuestions
Repair questions
Can our own pallets be repaired and returned?
Yes — that is a toll-repair arrangement, common for branded or custom-size stock. The supplier collects, repairs, re-grades and returns your own units. Minimum runs and turnaround are set by the supplier.
Is a repaired pallet as strong as a new one?
Not quite. A board replacement returns a unit close to its original rating; a full re-deck on an older frame will carry less than a new build. That is exactly why repaired units should be re-graded down — the grade is the honest signal. See load capacity.
What makes a pallet unrepairable?
Two or more split stringers, a broken block pattern, water saturation, mould, chemical staining, or wood that has gone soft from repeated wetting. Those are usually ground. Be suspicious of anyone who claims nothing is unrepairable.
Do repaired pallets need re-treating for export?
If they are going for export, yes, and this matters: repairing an HT-stamped pallet with untreated lumber voids the stamp. Ask the supplier how they keep treated and untreated board stock separated. See heat-treated pallets.
Failure patterns
Which part fails, and how it is usually fixed
Pallet damage follows a fairly stable pattern across the industry. It is also diagnostic: when your own returns look nothing like this, the cause is not ordinary wear.
| Part | How common | Usual cause | Typical repair |
|---|---|---|---|
| Lead board, top | Most common | Angled fork entry | Companion board / replacement |
| Interior deck board | Very common | Point load, dropped product | Companion board / replacement |
| Stringer end split | Common | Fork tine impact | Stringer plug / double |
| Bottom board missing | Common | Pallet jack, dock plate | Board replacement |
| Fastener loosening | Occasional | Smooth nails, thermal cycling | Denail and re-fasten |
| Out of square | Occasional | Side loading, rack creep | Re-square |
| Full deck wear | Less common | End of service life | Full re-deck |
| Centre stringer split | Less common | Overload, point loading | Stringer double |
Repair versus replace
Why repair usually wins on cost per trip
Repair is not maintenance of a pallet. It is interruption of a cascade: a sound frame with a few bad boards is far cheaper to fix than to replace. Ask the partner supplier to quote both so you can compare.
| Option | Resulting grade | When it makes sense |
|---|---|---|
| Companion board | B | One cracked deck board on a sound frame |
| Board replacement | B | A broken or missing board |
| Stringer plug | #2 | A split stringer where the load is light |
| Full re-deck | B | Worn deck boards on a sound frame |
| Re-square | B | A racked pallet bound for automated handling |
| Replace with recycled A | A | Customer-facing freight where appearance matters |
| Replace with new | New | Custom sizes or when no sound cores are available |
Toll repair
Having your own pallets repaired and sent back
Common for operations with branded, custom-size or specification stock where replacement is not a simple substitution.
| Item | What to ask |
|---|---|
| Minimum run | How many pallets per run? |
| Turnaround | How long from collection to return? |
| Collection and return | Included, or charged by distance? |
| Pricing | By repair class, in writing |
| Rejects | Returned to you, or bought as cores? |
| Re-grading | Independent second pass, stamped? |
| Branding | Preserved and restencilled if needed? |
| Treated stock | Segregated, re-treated and re-stamped if repaired? |
| Reporting | Repair-class breakdown with the return? |
What on-site repair usually involves
A supplier's crew and tooling inside your building, which removes the freight leg entirely.
- A small crew with mobile pneumatic tooling
- Reclaimed lumber delivered on a schedule
- Your grade specification, applied on site
- Regular repair-class and volume reporting
- A per-repair charge for delivered board stock
- Often net cheaper than freighting both ways
Got a pile of broken pallets?
They are usually worth more repaired than scrapped. Send a count and a photo and a partner supplier in our network will follow up.