Contact Us

Procurement · 12 minute read

How to run a pallet tender that does not optimise the wrong number

Most pallet RFPs are a price-per-unit exercise with a grade name attached, yet unit price is only one of the levers that decide what pallets really cost. This guide is written from the buyer's side of the table, including the questions that are awkward for suppliers.

Short answer

Measure all-in cost per trip, not unit price. Ask for a written grading standard, the racked load rating, and the supplier's own credit rate as a number.

Weight the award on grade reliability, repair capability and documentation — those decide how many pallets you buy.

Request a quote · no phone tag

Running a tender? Use this as your baseline

Send us your volume and requirements and we will pass them to partner suppliers in our network. Ask each one to answer the 24 questions below in writing — it makes every response comparable.

A working address so a partner supplier can reply.

US or Canada: area code then 7 digits.

Two-letter code or full name.

US ZIP code or Canadian postal code.

Pick one or type your own.

Whole units.

We use your details only to quote and schedule. No lists, no resale — see our privacy policy.

The RFP

Twenty-four questions, grouped

These are the questions that separate suppliers. Several of them are uncomfortable to answer, so we have set out what a straight response looks like alongside each one.

Specification and quality
QuestionWhy it mattersA good answer
Will you supply your written grading standard?A grade name without a definition is a sales categoryYes — a written document, supplied with the quote
Is the grade marked on each unit?Marking turns a dispute from days into minutesGrade and month stamped on a stringer
What happens to a repaired Grade A unit?The single most predictive quality questionIt becomes Grade B and is stamped B
How many repairs are permitted at each grade?Vague answers mean a drifting standardA specific number, e.g. up to two companion boards at Grade B
What is your squareness tolerance?Out-of-square passes visual inspection and stops conveyorsA figure, e.g. 0.5 in across the diagonals
Will you declare static, dynamic and racked ratings?Racked is the lowest of the three and governs storageYes, on every quote, with the span stated
Are those ratings tested or declared?Declared is honest; implied certification is notDeclared, stated as such in writing
Do you supply a count per grade on mixed loads?Otherwise the economics are unverifiableYes, as standard
What is your credit or dispute rate?Cannot be answered aspirationallyAn actual measured figure for outbound volume
Capability and capacity
QuestionWhy it mattersA good answer
Do you operate a repair line, and at what capacity?Repair is what suppresses the purchase lineStations, repair classes and throughput, stated
What proportion of inbound do you repair rather than grind?Separates a recycler from a grinderA measured split between re-graded, repaired and ground
Will you buy our surplus, and at what rates?Netting the two invoices is the largest single leverYes, with a written rate card by grade
Can you hold buffer stock, and how is it sized?Averages fail exactly when you need themYes, sized on your peak rather than your average
Can you build non-standard footprints?Overhang destroys both product and palletYes, with tolerance and minimum order stated
Do you supply ISPM-15 stock from a registered facility?Export compliance with no third party in the chainYes, with facility code and chart records supplied
Do you run your own trucks?Backhaul cuts freight and usually needs owned equipmentYes, with the service radius stated
What is your service standard, measured?Published standards with measured performanceStated standards plus last quarter's measured performance
Commercial and documentation
QuestionWhy it mattersA good answer
How long is a quote valid?An undated quote is a liability for both sidesA stated validity period on every quote
Are management fees shown separately?Hidden fees make a programme unauditableYes, as a visible line
Is there a deposit or exchange obligation?Exchange schemes disadvantage whoever has better palletsNone, or clearly stated
What is the notice period and exit cost?Lock-in substitutes for performanceShort rolling notice, no exit fees
Will you issue diversion documentation, and how often?Unevidenced diversion is worthless in a disclosureAt a stated frequency, at no extra charge
Is the tonnage weighed or estimated?Estimated tonnage cannot be used in a disclosureWeighed, not estimated
Are your environmental figures third-party verified?The answer tells you how they handle inconvenient factsAn honest answer either way
Will you tell us when a competitor suits us better?Advice versus a pitchYes, including rental pools and local reclaimers

Measurement

Six KPIs, and the one that actually matters

Most pallet programmes are reported on spend. Spend tells you what happened and not why. These six tell you why, and the first one subsumes the rest.

Pallet programme KPIs
KPIFormulaWhy it matters
All-in cost per trip(purchase + repair + freight + disposal − buy-back) ÷ movementsThe only measure that captures every lever
Loss rate per cycle(opening + received + purchased − shipped − closing) ÷ circulationA divisor on everything you paid for durability
Trips per unit1 ÷ loss rate, capped at design tripsDrives units purchased, the largest line
Repair ratiounits repaired ÷ units purchasedA high ratio is healthy, not a problem
Grade accuracycredited units ÷ units receivedLets you stop inspecting every delivery
Diversion ratetonnage diverted ÷ tonnage generatedReportable, and usually free to improve

Award

A scorecard that does not just reward the cheapest bid

Weighted so that the factors driving units purchased — which is most of the saving — outweigh the factor driving unit price. Adjust the weights, but do not leave the bottom four at zero.

Suggested supplier scorecard (out of 100 points)
CriterionWeightHow to score itEvidence to require
Unit price, blended across your grade mix20 ptsLowest bid scores 20, pro-rata aboveDated quote with freight shown separately
Grade reliability18 ptsWritten standard + unit marking + credit rateThe standard document and a credit-rate number
Repair capability15 ptsStations, classes, throughput, repair ratioA site visit, or photographs of the line
Buy-back capability and rate12 ptsPublished rates and a sort-sheet commitmentRate card and a specimen sort sheet
Freight structure10 ptsOwned fleet, backhaul, route frequencyRoute schedule and a backhaul-priced quote
Documentation and reporting10 ptsWeighed tonnage, stream-level, automaticA specimen diversion summary
Service standard, measured8 ptsPublished standards with measured performanceLast quarter's figures
Capability depth7 ptsCustom builds, ISPM-15, crating, odd sizesFacility registration and build examples

Contract terms worth insisting on

Eight clauses that cost a good supplier nothing and protect you from a poor one.

  • The signed dock count governs any quantity dispute
  • Grade marked on each unit, with the month
  • Count per grade on every mixed load
  • Dated quotes with a stated validity window
  • Freight shown as a separate line, never folded into unit price
  • Management fees visible, not embedded
  • Diversion documentation at a stated frequency, at no charge
  • Rolling notice period with no exit fee

Terms to refuse

Five things that appear in pallet contracts and should not.

  • Pallet deposit schemes, which tie up capital against an asset you own
  • Exchange obligations, which disadvantage whoever has better pallets
  • Multi-year lock-in substituting for measured performance
  • A single undifferentiated rate for 'mixed' grades
  • Environmental claims with no published method behind them

Tendering

Five ways a pallet tender goes wrong

  1. 01

    Tendering on unit price with a grade name attached

    Grade names are not standardised, so you are comparing bids against different specifications while believing you are comparing like with like. Meanwhile unit price is the smallest lever available.

    Instead: Specify the pallet properly — sixteen lines, including racked rating and board counts — and score on all-in cost per trip.

  2. 02

    Excluding disposal and handling from the comparison

    Disposal usually sits on the facilities budget and internal handling on nobody's. Handling is frequently one of the largest lines and is rarely measured.

    Instead: Build the baseline before the tender: purchase, repair, freight, disposal, handling, buy-back. Four hours with a clipboard.

  3. 03

    Not measuring loss rate before tendering

    Loss rate drives trips per unit, which drives units purchased, which is the largest line. Measured loss rates are usually far higher than operations guess, so the tender is modelled on a fiction.

    Instead: Four numbers a month for three months: received, shipped, purchased, counted. Then tender against a real figure.

  4. 04

    Awarding to a supplier with no repair line

    Without repair there is no mechanism to reduce units purchased, so the only lever left is unit price — which is where you started. A small unit-price saving is soon consumed by extra purchasing.

    Instead: Require repair throughput and a repair ratio in the response, and visit the line if the volume justifies it.

  5. 05

    Accepting environmental claims without a method

    An unevidenced diversion or carbon figure cannot be used in a disclosure, which means you have bought a number your own reporting team will reject.

    Instead: Require weighed tonnage, stream-level destinations, and a published factor list. Ask whether figures are third-party verified and note how honestly the question is answered.

Key takeaways

  • All-in cost per trip is the only measure that captures purchase, repair, loss, freight, disposal and buy-back together.
  • Unit price is only one lever, and rarely the largest. Weight your scorecard accordingly.
  • Ask for the written grading standard, the racked rating, and the supplier's own credit rate as a number.
  • A high repair ratio is healthy — it is the mechanism that suppresses purchasing.
  • Measure your loss rate for three months before tendering, or you will tender against a fiction.

Questions

Procurement questions

What should a pallet RFP ask for that most do not?

Three things. A written grading standard rather than a grade name. Racked load capacity rather than a single unstated rating. And the supplier's own credit or dispute rate as a number, which is the single most predictive question you can ask because it cannot be answered aspirationally.

What KPI should a pallet programme be measured on?

All-in cost per trip: purchase plus repair plus freight plus disposal minus buy-back, divided by pallet movements. Unit price is only one of those lines, and rarely the one with the most room to move, so a tender optimised on unit price optimises a narrow lever.

Should a pallet contract be awarded on price?

Not on unit price alone. Weight it alongside loss-rate impact, repair capability, grade reliability and documentation, because those four determine how many pallets you buy — which is where most of the saving sits. A supplier who is slightly cheaper per unit but has no repair line can easily cost you more over the life of the contract.

Running a pallet tender?

Send us your requirements and we will pass them to partner suppliers in our network. Ask each for written answers to the twenty-four questions so every response is comparable.