Contact Us

Service 01

Buying pallets, without the three-day quote game

You need a count, a grade and a date. Send those once and we pass your request to partner suppliers in our network who stock that kind of pallet in your part of Colorado.

Short answer

Standard recycled 48×40 stock is the easiest pallet to source in the Denver metro. Delivery minimums and lead times are set by each supplier; collecting small orders yourself is often cheaper.

Mixed-grade loads are normal, not an exception.

Request a quote · no phone tag

Request a quote

One form, one request. We pass it to partner suppliers in our network, and a partner supplier follows up with a quote.

A working address so a partner supplier can reply.

US or Canada: area code then 7 digits.

Two-letter code or full name.

US ZIP code or Canadian postal code.

Pick one or type your own.

Whole units.

We use your details only to quote and schedule. No lists, no resale — see our privacy policy.

How ordering works

Six steps from request to delivery

  1. 01

    You send the three numbers

    Count, grade and delivery date. If you are unsure about grade, describe what the pallet carries and where it goes.

  2. 02

    We match your request

    We pass it to partner suppliers in our network who carry that grade and footprint and serve your area.

  3. 03

    A supplier quotes

    A partner supplier follows up with a quote covering the pallets and freight. Mixed grades are usually priced as separate lines.

  4. 04

    You confirm with the supplier

    Ordering, payment and account terms are agreed directly between you and the supplier.

  5. 05

    Stock is banded and loaded

    Good suppliers band stacks with count and grade labels and can photograph the loaded trailer for your records — it is worth asking for.

  6. 06

    Delivery and empty-leg offer

    If you have surplus going out, the same trailer can often take it back for credit. Mention it in your request.

Logistics

Freight, minimums and what fits on a truck

Typical load capacities (vary by supplier and equipment)
Vehicle48x40 capacityTypical use
Customer pickup (your truck)as fits6 – 60 units
Flatbed, single stack260 – 300Yard-to-yard
53' dry van, single stack500 – 560Dock-to-dock
53' dry van, double stack880 – 1,040High-volume, low-profile stock
Box truck with lift gate120 – 160No dock on site
Hot shot / emergency80 – 140Urgent shortfalls

Key takeaways

  • Say if you have no dock. A lift-gate truck costs more than a trailer, and far less than a failed delivery.
  • Double stacking only works where height allows, but it cuts freight per unit sharply when it does.
  • Standing weekly orders usually get priority on grade availability during the Q4 crunch.
  • A 53-foot trailer needs roughly 60 feet of approach. If your lot is tight, say so in your request.

Terms

What to ask a supplier about terms

  • How long the quote is valid
  • What delivery minimum applies at your distance
  • Whether standing-order pricing is fixed for a period or re-quoted each time
  • Whether a collection of your surplus can go on the same trip
  • Whether a fuel surcharge applies at your distance
  • Whether there is any deposit or exchange obligation

Volume

What volume usually changes

  • Larger orders usually mean a lower unit price, because freight and handling are shared across more pallets
  • Full trailer loads are easier to schedule than part loads
  • Regular orders make it easier for a supplier to keep your grade in stock
  • Pricing is quoted by the partner supplier and depends on grade, size, volume, heat treatment and distance

Questions

Buying questions

Can I see the pallets before buying a truckload?

Ask for samples in your request. Many suppliers will drop a sample unit of each grade before a first truckload, or let you inspect stock at their site.

What if I need a grade that is hard to find?

Ask the supplier for an honest lead time rather than accepting a silent substitution. Grade A in volume can tighten in Q4; block pallets and Euro stock are often sourced to order on a cycle of several days.

Is pallet exchange on delivery available?

Some suppliers offer it, but exchange schemes tend to disadvantage whoever has the better pallets. Selling your surplus outright at a stated grade price is usually cleaner — see selling pallets.

Can a supplier hold stock for us?

Many suppliers will carry an agreed buffer of your grade and footprint for standing-order customers, which is the practical answer to seasonal spikes. See recurring pickup and delivery.

Freight, in full

What drives delivery cost, and how to reduce it

Pallets are cheap, bulky and low value, so freight is often the biggest line on the invoice. It is also the most controllable, and almost nobody tries.

Vehicle capacity by type
Vehicle48×40 capacityUse
Customer pickup6 – 60Small orders
26' box truck, lift gate120 – 160No dock on site
48' flatbed260 – 300Yard to yard
53' van, single stack500 – 560Dock to dock
53' van, double stack880 – 1,040Low-profile stacks
Hot shot80 – 140Urgent shortfall
Walking floorFull trailer of fibreMulch and fibre

Ways to cut your own freight

In order of how much difference they make. The first one is free and most people skip it.

  • Mention a collection in the same request as the delivery
  • Accept a two-day window instead of a fixed time
  • Get onto a standing route rather than ordering ad hoc
  • Check whether your dock allows double stacking
  • Consolidate several sites onto one route trip
  • Collect small orders yourself where the supplier allows it

What arrives

How a well-prepared load is banded, labelled and photographed

Six things a good supplier does between the pull and the dispatch, two of which exist purely so that mistakes never reach your dock. Worth asking about when you compare quotes.

  1. 01

    Pulled to the order sheet

    By grade and footprint, with mixed-grade orders pulled as separate stacks.

  2. 02

    Pre-pull grade check

    The pulled stock is re-checked against the ordered grade before anything is banded. Invisible step; catches the most expensive category of error.

  3. 03

    Stacked to height

    Fifteen or eighteen high depending on unit height, square and aligned. An out-of-square stack arrives leaning and sheds units.

  4. 04

    Banded and labelled

    Steel or PET banding, with count and grade labelled on the outside of each stack so your receiving team can verify without unbanding.

  5. 05

    Loaded and photographed

    A photo of the loaded trailer before the doors close ends most disputes before they begin.

  6. 06

    Dispatched with a window

    A delivery window rather than a whole day, and notice if it will slip.

Ordering

Five ordering mistakes that cost money or time

  1. 01

    Not saying there is no dock

    A 53-foot trailer arrives at a site that needs a lift-gate box truck. The delivery fails, the truck returns loaded, and the second attempt is billable.

    Instead: One sentence about your dock in the first request. A lift-gate truck costs more than a trailer and far less than a failed delivery.

  2. 02

    Ordering Q4 Grade A volume in October

    Grade A is only a minority of the inbound mix at most recyclers, and the whole market bids for it from September while core supply falls.

    Instead: Order your November requirement in August. Nothing else in pallet purchasing has a bigger spread for less effort.

  3. 03

    Ordering a single grade for every flow

    You end up either overpaying on internal moves or risking a chargeback on customer-facing freight. One grade cannot be right for both.

    Instead: Order two grades on one truck — for example a larger quantity of Grade B plus a smaller quantity of Grade A, as two line items.

  4. 04

    Treating the quote as open-ended

    Lumber and reclaimed stock both move. An undated quote accepted three months later is not a price, it is the start of an awkward conversation.

    Instead: Ask for a dated quote with a validity window, and ask for a fresh one if time has passed.

  5. 05

    Not asking whether the stock is on the ground

    Euro, block and odd-size stock is often sourced to order over several days. A supplier who says 'tomorrow' for everything is managing your expectations rather than your order.

    Instead: Ask directly: is this in your yard now?

Things that set the minimum order

Collecting yourself
often no minimum
Delivered, metro
set by supplier
Delivered, further out
rises with distance
Custom build
small runs possible
Prototype
often 1 unit
Heat treatment run
kiln-load based
Mulch, delivered
by the truckload

Count, grade, date

Those three things are enough for a partner supplier to quote. Everything else can be worked out after.