Contact Us

Economics · 19 May 2022

What a pallet RFP should ask, and never does

Most pallet tenders optimise unit price, which is only a small part of the available saving. Here are the questions that would find the rest.

Short answer

8 minute read · Published May 19, 2022

Request a quote · no phone tag

Need this applied to your own operation?

Send the numbers and we will pass them to partner suppliers in our network, who follow up with pricing and pickup or delivery windows.

A working address so a partner supplier can reply.

US or Canada: area code then 7 digits.

Two-letter code or full name.

US ZIP code or Canadian postal code.

Pick one or type your own.

Whole units.

We use your details only to quote and schedule. No lists, no resale — see our privacy policy.

procurementeconomicstenderingKPIs
19 May 20228 min read

Pallet tenders are usually built to compare prices. That makes sense on paper, but the winning bid on price can easily cost more within a couple of quarters — and a typical tender document has no way of detecting it.

What a typical pallet RFP contains

Three things, usually: a volume, a footprint and a grade name. Sometimes a delivery expectation. Occasionally a sustainability questionnaire bolted on at the end, written by somebody who has not spoken to the person writing the specification.

That is enough to generate comparable prices and not nearly enough to generate comparable offers, for one specific reason.

Grade names are not standardised

There is no legally binding grading standard for used pallets in North America. Grade A means whatever the supplier selling it says it means, and at the boundaries — how many repairs, how much weathering, how far out of square — the definitions diverge by hundreds of pounds of racked capacity.

So a tender asking for "500 Grade A 48×40 per week, delivered" will produce bids that differ meaningfully on price and by considerably more on what actually arrives. The procurement process believes it is comparing like with like. It is not.

A tender specified by grade name is a tender specified in a language where every supplier has their own dictionary.

The three questions that separate suppliers

1. Will you supply your written grading standard?

Not a grade name. The document. A supplier who has one will send it immediately; a supplier who does not will send a paragraph about industry standards. Both answers are informative.

2. What happens to a repaired Grade A pallet?

If you could only ask one question, ask this. If the answer is that it stays Grade A because the repair is sound, the grade has stopped being a specification and become a sales category — and you will have to inspect every delivery, which destroys the efficiency grading exists to create. A supplier who re-grades repaired units downward is giving up some margin to keep the grade meaningful.

3. What is your credit or dispute rate?

The best question in the set, because it cannot be answered aspirationally. Either a supplier knows the number or they do not, and if they do not, that is the answer.

The number the tender should actually be scored on

All-in cost per trip: purchase plus repair plus freight plus disposal minus buy-back, divided by pallet movements. It is the only measure that captures every lever at once.

Where savings typically come from in a managed pallet programme (illustrative)
SourceTypical contributionVisible in a price-based tender?
Buying fewer unitsLargeNo
Eliminated disposal costModerateNo
Reduced internal handlingModerateNo
Buy-back creditModerateNo
Lower freightSmallPartly
Lower unit priceSmallYes
Less: repair spend and fees addedNegativeYes, and it looks bad

Read the right-hand column. A price-based tender can see only a small slice of the available benefit, and the lines it sees most clearly — repair spend and management fees — look like costs while actually being the mechanism.

Why a high repair spend is a good sign

Procurement instinct is to minimise it. But repair is what suppresses purchasing: an inexpensive companion board can buy several more trips, against the price of a whole replacement pallet.

If a tender response shows repair spend at zero and purchases halving, ask where the pallets came from. There is no third mechanism.

A scorecard that would find the right supplier

Suggested priorities, highest first
CriterionPriorityEvidence to require
Unit price, blended across your grade mixHighDated quote, freight shown separately
Grade reliabilityHighThe written standard, plus a credit-rate number
Repair capabilityHighThroughput, repair ratio, or a site visit
Buy-back capabilityMediumHow they price surplus, and a specimen sort sheet
Freight structureMediumFleet access, backhaul, route frequency
Documentation and reportingMediumA specimen diversion summary
Service standard, measuredLowerLast quarter's actual figures
Capability depthLowerISPM-15 treatment access, custom builds, odd sizes

Two things to do before the tender goes out

  1. Build the baseline. Purchase, repair, freight, disposal, handling, buy-back — on one page. Without it you cannot score anything except price.
  2. Measure your loss rate for three months. Four numbers a month: received, shipped, purchased, counted at month end. Measured loss is nearly always higher than people guess, which means many tenders are modelled on a fiction.

Key takeaways

  • Grade names are not standardised, so a tender specified by grade name is not comparing like with like.
  • Ask for the written grading standard, what happens to a repaired Grade A unit, and the supplier's credit rate.
  • Score on all-in cost per trip. Unit price is only a small part of the available saving.
  • A high repair spend is the mechanism, not the overhead. Zero repair spend plus halved purchases is not arithmetic.
  • Build your baseline and measure your loss rate before the tender, or you will score on the only thing you can see.
A longer list of RFP questions, KPIs and a weighted scorecard is in the pallet procurement guide. You can also send your requirement through the quote form and partner suppliers in our network can respond.

Questions about any of this?

One form, passed to partner suppliers in our network who can quote it.