Contact Us

Operations · 24 April 2025

Repair classes C1 to C8, and when each is worth it

Eight common repair types, and why a companion board is one of the cheapest fixes in the business. An illustrative repair catalogue.

Short answer

9 minute read · Published Apr 24, 2025

Request a quote · no phone tag

Need this applied to your own operation?

Send the numbers and we will pass them to partner suppliers in our network, who follow up with pricing and pickup or delivery windows.

A working address so a partner supplier can reply.

US or Canada: area code then 7 digits.

Two-letter code or full name.

US ZIP code or Canadian postal code.

Pick one or type your own.

Whole units.

We use your details only to quote and schedule. No lists, no resale — see our privacy policy.

repairoperationsgradingstandards
24 April 20259 min read

Pallet repair lines commonly run off a mark made by a grader at intake: a repair class, or teardown. There is no universal numbering, but the repair types themselves are standard across the industry.

Here is an illustrative catalogue using a C1–C8 labelling: what each class fixes, how much work it involves, what it does to the grade, and when it is not worth doing. Repair pricing comes by quote from partner suppliers and depends on the damage mix, volume and location.

The catalogue

Illustrative repair classes, 48x40 stringer pallet
ClassWorkFixesRelative effort
C1Companion boardOne cracked deck boardMinimal
C2Board replacementBroken or missing deck boardLow
C3Stringer plugSplit or notched-out stringerModerate, skilled
C4Companion stringerBadly split stringer, full lengthModerate
C5Partial re-deckThree or more deck boardsModerate
C6Full re-deckWorn deck, sound frameHigh
C7Re-squareOut of square over 0.5"High, skilled
C8Denail and re-fastenLoose, rattling assemblyLow to moderate

Class by class

C1 — Companion board

A sound board fastened alongside a cracked one rather than replacing it. One of the cheapest valid repairs in the industry and one of the most common.

Why not just replace the board? Because removing a cracked board means pulling several hardened helical nails, which damages the stringer top surface and takes much longer. The companion board adds a little weight and restores most of the lost stiffness.

It is also the marker that should drop a pallet from Grade A to Grade B — see why repaired pallets should be re-graded downward.

C2 — Board replacement

Used when the board is missing entirely, or when a companion board would leave the deck too uneven — typically on the two lead boards, where a doubled board creates a lip that catches forks.

C3 — Stringer plug

A block let into a split stringer to restore section. Skilled work: the plug has to be a tight fit or it does nothing, and the split has to be stopped first, usually by drilling the crack tip.

A plugged stringer generally drops the unit to Grade #2 and out of racking service, because a plug does not restore the stringer's performance in bending across rack beams.

C4 — Companion stringer

A full-length stringer fastened alongside a badly split one. Heavier, more expensive, and the practical limit of stringer repair. Two companion stringers make the pallet heavier than a new one, at which point the correct answer is teardown.

C5 and C6 — Partial and full re-deck

Three or more boards, or all seven. A full re-deck is one of the longest routine repair jobs. It is worth doing when the frame is genuinely sound, which on a reclaimed unit means the stringers show no splits, no plugs and no soft wood.

A common problem in the market is a shiny new top deck on a frame that is finished. Always inspect the old stringers, never the new boards — see reading a pallet.

C7 — Re-square

Partial disassembly, pull the frame back into true, re-fasten. One of the most skilled repair jobs because the frame wants to go back where it was and the fastener holes are already elongated. Not every recycler offers it — see out of square.

C8 — Denail and re-fasten

Fasteners replaced with helical nails. Used on units that rattle — usually pallets built with smooth shank, or pallets that have been through enough Colorado freeze-thaw cycling to walk their fasteners out. See altitude, UV and freeze-thaw.

Why repair comes first

Repair vs replace, per unit (qualitative)
ScenarioRelative costResulting gradeRemaining life
C1 companion boardLowestBGood
C3 stringer plugLow#2Moderate
C6 full re-deckModerateBGood
Replace with recycled AHigherAGood
Replace with newHighestNewLongest

A small repair buys a sound frame several more trips for a fraction of what a replacement pallet costs, which works out far cheaper per trip than buying new. That gap is why repair comes first in any well-run pallet programme.

When repair is not worth it

  • Two or more split stringers. The frame has lost continuity. Teardown.
  • Punky wood. A thumbnail dents it. The material has failed, not the assembly. Nothing fixes this.
  • Mould or chemical staining. Absolute reject. The unit should leave the reuse stream entirely.
  • Water saturation. Cannot be stamped cleanly, will not hold a fastener, and if it has been wet long enough it should not enter the fibre stream either.
  • Economics. Three stacked repairs on a #2 unit costs more than the pallet is worth. Tearing it down yields boards that repair better units.
Be suspicious of anyone who claims nothing is unrepairable. The honest skill is knowing which pallets to stop working on.

On-site repair

High-volume sites can sometimes have repair done at their own facility by a mobile crew with board stock delivered. It eliminates the freight leg, which is often worth more than the labour differential. The limitation is lumber supply: on-site crews need recovered board stock brought in.

Key takeaways

  • Repair types are standard across the industry even if the class numbering varies.
  • A companion-board repair is cheap and can buy many more trips.
  • Per trip, repair typically costs a fraction of what replacement does.
  • When inspecting a re-decked pallet, examine the old stringers rather than the new boards.
  • Five conditions stop a repair: two split stringers, punky wood, mould, chemical staining, saturation.
Have a pile that needs repair, or branded stock you want refurbished? Describe it in the quote form and partner suppliers in our network can quote. See repair and refurbishing.

Questions about any of this?

One form, passed to partner suppliers in our network who can quote it.